Day Center for Dependent Elderly People in Meliana

Meliana
Video ©
Foto © Milena Villalba
Foto © Milena Villalba
Foto © Milena Villalba
Foto © Milena Villalba
Foto © Milena Villalba
Architetti
AHEAD Barcelona Healthcare Architecture
Sede
Meliana
Anno
2023
Cliente
Ajuntament de Meliana
Co-autor
Virai Arquitectura

The project develops a building, initially on the ground floor, with several open areas that allow the different functional spaces of the building to be related while providing environmental quality to the building and to the users. It is a unique building, with simple and clean lines, wide walls and a sustainable construction system that is perfectly suited to the needs of the Valencian Albufera: a building constructed of structural wood prefabricated with straw bale insulation inside.

Due to the geometry of the plot, the construction system of wide straw bales and the extensive program to be carried out on the ground floor, the building is considered as a closed volume on itself, but which in turn is related to the environment (parks , orchard, etc.) through the exterior and open spaces that are generated within the perimeter of the plot, as "bites" of the exterior rectangular geometry.

The building (2179 m2) allows its growth on a higher floor, to house a future residence for the elderly, under the updated and humanized model of coexistence units or groups of around 15-20 people in the same area.

Progetti collegati

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressiver Reinraumausbau
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Rivista

Altri progetti di AHEAD Barcelona Healthcare Architecture

Renovations at Sant Joan de Déu Hospital
Barcelona
Extension of the Sant Joan de Déu Hospital of Manresa
Manresa
New VHIR Building Vall d'Hebron
Vall d'Hebron
PAU II Healthcare Centre
Alacant
Extension and Renovation of the Bassa d’Alcoi Health Centre
Bassa d’Alcoi