Comas-Pont Arquitectes slp

Marta Mata school

Comas-Pont Arquitectes slp
5. November 2015
Comas-Pont Arquitectes slp
Comas-Pont Arquitectes slp

Like a rotary element of all spaces, large double height lobby with access to child area and primary zone and it serves as a connection with administration, services and patio.
To meet tight construction deadlines (10 months), we work with structural and constructive pre industrialized systems. A precast concrete in the two large ships combines with a metallic structure in the lobby area, porches and changing room.

Comas-Pont Arquitectes slp

The outer skin is unified with a single material (corrugated miniona sheet) that adapts to different needs becoming facade, roof, ceiling or bri-soleil and could be opaque or perforated when is necessary to light penetrate in but direct sunlight must to be screened.

Inside, we looking for warmth and comfort using natural and recycled materials. The light fixtures are mostly lined with wood chipboard OSB and carpenters are made from natural pine. On the roof, the micro perforated corrugated iron from outside penetrates and extends through the lobby, hallways and common areas, hiding installations and giving acoustic comfort.

Throughout the building are enhanced visual outwards, mainly along the entire facade in contact with the protected linear porch that prevents radiation from south and allows a very extensive semi-outdoor sheltered patio.

Comas-Pont Arquitectes slp
Comas-Pont Arquitectes slp
Comas-Pont Arquitectes slp
Comas-Pont Arquitectes slp

Other articles in this category

Marta Mata school
on 11/5/15