Center for the Elderly in Zamora

Meliana
可视化 © Ahead BHA
可视化 © Ahead BHA
可视化 © Ahead BHA
可视化 © Ahead BHA
建筑师
AHEAD Barcelona Healthcare Architecture
位置
Meliana
客户
Gerència de Serveis Socials de Castella i Lleó
Co-autor
Virai Arquitectura
Co-autor
LNG Arquitectos

The project seeks to solve an occupation in an irregular triangular-shaped plot that allows an adequate arrangement of the groups of living units. A first level as a plinth houses the entire common program (technical and public) and the day centre. On this plinth there are two independent buildings in which the living units are located. Each of these buildings includes two coexistence units per floor, which share a common core of communication, facilities, and services, which facilitates communication between the two units. This scheme is repeated on 3 floors. The project takes advantage of the possibilities offered by the topography of the land to be able to reduce the interference of the service accesses with the outdoor and more private landscaped areas in the highest part. There is a clear separation of technical uses and public uses, allowing the absence of interferences between the two circuits.

相关项目

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

杂志

以下出品方的其他项目 AHEAD Barcelona Healthcare Architecture

Renovations at Sant Joan de Déu Hospital
Barcelona
Extension of the Sant Joan de Déu Hospital of Manresa
Manresa
New VHIR Building Vall d'Hebron
Vall d'Hebron
PAU II Healthcare Centre
Alacant
Extension and Renovation of the Bassa d’Alcoi Health Centre
Bassa d’Alcoi