Recovery of the Old Gypsum Mines of Igualada

 回到项目列表
位置
Igualada, Barcelona
年份
2018
客户
Igualada City Council
团队
Enric Batlle, Joan Roig, Iván Sánchez, Mario Súñer, Simone Cicu
Structural Engineering
Static
Builder
Constructora Moix Serveis i Obres

The work is framed within the global project of the Igualada’s Green Ring, which aims at creating a set of pedestrian and bicycle itineraries in the form of a green belt on the perimeter of the city. The natural space through which the path passes has a highly degraded state. It was subjected to intense extractive activity of existing plaster in its subsoil (Guixeres of the Claret and Pelfort). Afterwards, once this activity ceased, the area was used as a municipal waste transfer station.

The project has two main objectives: one of connectivity, achieving the continuity of this global green ring recognizing the main visuals about the city and Montserrat mountain, and generating a sequence of areas of stay; and a second of landscape and biodiversity recovery, establishing the necessary elements to generate a new dynamic in the place that progressively improves its environmental conditions through the profit of water.