Recovery of the Old Gypsum Mines of Igualada
Igualada, Barcelona
The work is framed within the global project of the Igualada’s Green Ring, which aims at creating a set of pedestrian and bicycle itineraries in the form of a green belt on the perimeter of the city. The natural space through which the path passes has a highly degraded state. It was subjected to intense extractive activity of existing plaster in its subsoil (Guixeres of the Claret and Pelfort). Afterwards, once this activity ceased, the area was used as a municipal waste transfer station.
The project has two main objectives: one of connectivity, achieving the continuity of this global green ring recognizing the main visuals about the city and Montserrat mountain, and generating a sequence of areas of stay; and a second of landscape and biodiversity recovery, establishing the necessary elements to generate a new dynamic in the place that progressively improves its environmental conditions through the profit of water.
- 場所
- Igualada, Barcelona
- 年
- 2018
- クライエント
- Igualada City Council
- チーム
- Enric Batlle, Joan Roig, Iván Sánchez, Mario Súñer, Simone Cicu
- Structural Engineering
- Static
- Builder
- Constructora Moix Serveis i Obres
関連したプロジェクト
Magazine
-
-
-
-
Un despatx madrileny signa un visionari catalitzador urbà en West Palm Beach
Andrea Pala | 29.11.2018 -
L'arquitectura de Francis Keré en escena en el Museu ICO de Madrid
Andrea Pala | 28.10.2018