Extension of Bellvitge University Hospital - Phase II

L'Hospitalet de Llobregat
Photo © Ariel Ramirez
Photo © Juny Brullet
Photo © Juny Brullet
Photo © Juny Brullet
Architectes
PINEARQ
Lieu
Feixa LLarga, s/n, 08907 L'Hospitalet de Llobregat
Année
2015
Équipe
Alberto de Pineda, Raffaella Scorziello, Lluís Hernàndez, Albert Vitaller, M. Àngels Manchado, Ariadna Pérez

In this extension’s phase, the emergency and intensive care areas and the surgical block were developed for the hospital’s Bellvitge Campus of the University of Barcelona. A covered plaza distributes to the emergency room, to the ambulances’ parking lot and to the entrance to the complementary services that attend the different medical specialities.

The general administration activities are concentrated at the old building, and the existing hospitalization units are rehabilitated. A bridge that connects outpatient areas with this development is built. In the basement of the new building, the logistics and supply activities of the entire hospital structure are organized. The emergency area and outpatient activities are available on the ground floor. The surgical and diagnostic functions are arranged in the three upper levels.

Projets liés

  • Shanghai Suhe MixC World
    KOKAISTUDIOS
  • Welcome to the Stage!
    Kjellander Sjöberg
  • Hovering Kan-Too – Great Bay Area Center Showroom
    Wutopia Lab
  • Stockwell-Rodríguez Residence
    Belmont Freeman Architects
  • Haunsbergstraße | 1. Preis
    Architektinnen Schremmer.Jell ZT GmbH

Magazine

Autres projets de PINEARQ

Residence for the Elderly in Vilanova i la Geltrú
Vilanova i la Geltrú
Building for Severe Mental Disorders in Martí i Julià Hospital Park
Salt
Outpatient Building in Hospital del Mar
Barcelona
New Children's Hospital and Maternity Building of Hospital Santo Tomas
Panama City, Panama
Renovation and Extension of Granollers Asylum Hospital
Granollers