Alt Penedès Hospital
Vilafranca del Penedès
The hospital, completed in 1994, has 168 beds. Since 2005, the original facility has been extended several times. The first intervention was to the outpatients’ department, with the addition of a day hospital. This was followed by a new county-level laboratory, and later by the extension and retrofitting of the emergency department, day surgery and obstetrics unity.
- Architectes
- GINA Barcelona Architects
- Lieu
- Carrer de l'Espirall, 08720 Vilafranca del Penedès
- Année
- 1994
Projets liés
Magazine
-
-
-
-
Un despatx madrileny signa un visionari catalitzador urbà en West Palm Beach
Andrea Pala | 29.11.2018 -
L'arquitectura de Francis Keré en escena en el Museu ICO de Madrid
Andrea Pala | 28.10.2018