Terminal 4 Singapore Changi Airport
Singapore, Singapore
Singapore Changi Airport broke ground for the construction of Terminal 4 (T4) on 5 November 2013. To be built on the former Budget Terminal site, T4 will be a two-storey building with a height of 25 meters and a gross floor area of 195,000 square meters. With a planned capacity of 16 million passenger movements a year, T4 will raise Changi Airport’s handling capacity to 82' million a year. The terminal is being designed with the flexibility to meet the operational needs of both full-service and low-cost carriers. T4 was openend end of October 2017.
- Lighting Designers
- Lichtvision Design
- Year
- 2017
- Executive Architect
- SAA Architects
- Design Architect
- Benoy
Related Projects
Magazine
-
-
-
-
Un despatx madrileny signa un visionari catalitzador urbà en West Palm Beach
Andrea Pala | 29.11.2018 -
L'arquitectura de Francis Keré en escena en el Museu ICO de Madrid
Andrea Pala | 28.10.2018





