Parabolic Trough Power Plant AndaSol II

Aldeire
Engineers
schlaich bergermann partner
Location
Aldeire
Year
2009

The solar thermal power plant AndaSol II is located in the immediate neighbourhood of AndaSol I and is almost identical in construction. It has a rated output of 50 MW and can be operated for six hours out of its thermal storage during periods without sunlight. The power station produces approximately 179 GWh annually, providing up to 200,000 people with electricity. The collector field of one power plant covers an area of 1,500 x 1,300 meters. The 7,488 solar collector elements (SCEs) have a total collector area of 510,000 m2. The collectors are composed of a steel framework construction with attached curved glass mirrors.

Type of structure
Parabolic trough collector with automatic tracking

Owner
Andasol-1 Central Termosolar 2 S.A., Madrid

Scope of our work
design, detailed engineering, tender documents, fabrication and site supervision

Technical data
Aperture width: 6 m
SCE length: 12 m
SCEs per SCA: 12
Loop length: 600 m
Aperture area: 510,000 m2
Licenso: schlaich bergermann und partner

Related Projects

  • Promenade Favorita, Lugano TI
    mavo gmbh
  • Garten Höhenweg St.Gallen
    mavo gmbh
  • Sagiareal, Greppen LU
    mavo gmbh
  • Progressive cleanroom expansion
    Lindner Group
  • Büro Allmendstrasse
    BFB Architekten AG

Magazine

Other Projects by schlaich bergermann partner

SOSC Shanghai Oriental Sports Center
Shanghai, China
Phyllis Tilley Memorial Bridge
Fort Worth, USA
Maracanã-Stadion (Estádio Jornalista Mário Filho)
Rio de Janeiro, Brazil
Dalian Twin Towers
Dalian, China
Christlicher Garten Marzahn
Berlin, Germany